Problems: Long-term road construction Location: US 17/US 92 Both NB/SB at DOCTORS INLET BRG Lanes Impacted: DOCTOR'S INLET BRIDGE WIDENING PROJECT. EXPECTED TO FINISH - WINTER 2010. WATCH FOR LANE CLOSURES AND DELAYS DURING NON-RUSH HOURS. Reported on 5/10/2008 4:45:01 PM
Problems: Construction work Location: US 1 Both NB/SB at HWY 104/DUNN AVE Lanes Impacted: LANE CLOSINGS MAY OCCUR ON NEW KINGS ROAD AT TROUT RIVER BLVD, DUE TO THE TURN LANE PROJECT. SOUTHBOUND LANES WILL STAY OPEN DURING MORNING RUSH HOURS AND NORTHBOUND LANE WILL BE OPEN DURING AFTERNOON RUSH. (PROJECT WILL END THIS SUMMER) Reported on 5/10/2008 4:45:01 PM
Problems: Road construction. Right lane closed Location: HWY 113/HWY 9A NB between DAMES POINT BRG and DAMES POINT BRG NORTH Lanes Impacted: RIGHT LANE OVER THE DAMES POINT BRIDGE CLOSED UNTIL THE SPRING OF 2009 FOR BRIDGE REPAINTING. Reported on 5/10/2008 4:45:01 PM
Problems: Road construction. Right lane closed Location: HWY 113/HWY 9A SB on DAMES POINT BRG Lanes Impacted: About 2,600 feet of the right southbound lane near the peak of the bridge is closed until the spring 2008 for the bridge repainting project. This project should be finished in the fall of 2008. Reported on 5/10/2008 4:45:01 PM
Problems: Road construction. Right lane closed Location: HWY 228 EB between ALCOY RD and CHAFFEE RD Lanes Impacted: ONE EASTBOUND LANE OF NORMANDY CLOSED BETWEEN NEW WORLD AVENUE AND CHAFFEE ROAD FOR LONG TERM CONSTRUCTION. Reported on 5/10/2008 4:45:01 PM
© 2008 Newport Television LLC |
Site Map |
Terms Of Use |
Privacy Statement |
Copyright & Trademark Notice |
EEO