Download: RSS | Email Alerts | Podcasts | CBS47 Mobile

Traffic: Jacksonville, FL
Last Update: 5/17/2008 6:35:00 AM

Severity: Construction

Problems: Road construction. Right lane closed
Location: HWY 228 EB between ALCOY RD and CHAFFEE RD
Lanes Impacted:
ONE EASTBOUND LANE OF NORMANDY CLOSED BETWEEN NEW WORLD AVENUE AND CHAFFEE ROAD FOR LONG TERM CONSTRUCTION.
Reported on 5/16/2008 6:00:00 PM and Expected to end on 5/17/2008 6:00:00 PM

Problems: Road construction. Right lane closed
Location: HWY 113/HWY 9A NB between DAMES POINT BRG and DAMES POINT BRG NORTH
Lanes Impacted:
RIGHT LANE OVER THE DAMES POINT BRIDGE CLOSED UNTIL THE SPRING OF 2009 FOR BRIDGE REPAINTING.
Reported on 5/16/2008 6:00:00 PM and Expected to end on 5/17/2008 6:00:00 PM

Problems: Long-term road construction
Location: US 17/US 92 Both NB/SB at DOCTORS INLET BRG
Lanes Impacted:
DOCTOR'S INLET BRIDGE WIDENING PROJECT. EXPECTED TO FINISH - WINTER 2010. WATCH FOR LANE CLOSURES AND DELAYS DURING NON-RUSH HOURS.
Reported on 5/16/2008 6:00:00 PM and Expected to end on 5/17/2008 6:00:00 PM

Problems: Construction work
Location: US 1 Both NB/SB at HWY 104/DUNN AVE
Lanes Impacted:
LANE CLOSINGS MAY OCCUR ON NEW KINGS ROAD AT TROUT RIVER BLVD, DUE TO THE TURN LANE PROJECT. SOUTHBOUND LANES WILL STAY OPEN DURING MORNING RUSH HOURS AND NORTHBOUND LANE WILL BE OPEN DURING AFTERNOON RUSH. (PROJECT WILL END THIS SUMMER)
Reported on 5/16/2008 6:00:00 PM and Expected to end on 5/17/2008 6:00:00 PM

Problems: Paving operations. Roadway reduced to one lane
Location: STATE HWY A1A Both NB/SB between HWY 105/HECKSCHER DR and LONG POINT DR
Lanes Impacted:
ON-GOING RESURFACING PROJECT ON HECKSCHER DRIVE, BETWEEN THE FERRY SLIP AND THE NASSAU COUNTY LINE.
Reported on 5/17/2008 12:13:40 AM and Expected to end on 5/17/2008 2:13:40 AM

Problems: Long-term road construction
Location: US 90 Both EB/WB between SAINT JOHNS BLUFF RD and HODGES BLVD
Lanes Impacted:
ON BEACH BLVD, EXPECT LANE CLOSURES AND POSSIBLE DETOURS BETWEEN F.C.C.J. SOUTH AND HODGES BLVD. PROJECT EXPECTED TO END IN EARLY JUNE.
Reported on 5/17/2008 12:13:40 AM and Expected to end on 5/17/2008 2:13:40 AM

Problems: Road construction. Right lane closed
Location: HWY 113/HWY 9A SB on DAMES POINT BRG
Lanes Impacted:
About 2,600 feet of the right southbound lane near the peak of the bridge is closed until the spring 2008 for the bridge repainting project. This project should be finished in the fall of 2008.
Reported on 5/16/2008 6:00:00 PM and Expected to end on 5/17/2008 6:00:00 PM